CONMOLY
Lightweight Coax for Airborne Antenna Feed Review
An airborne antenna feed starts with a system requirement: where the RF path runs, how much loss is available and what mass and installation envelope the platform can accept. A lightweight cable construction can be screened against that requirement, but cable dimensions alone do not establish the suitability of the complete installed assembly.
Use the published mass for the exact cable construction
CONMOLY’s lightweight phase-stable cable series currently lists the following cable dimensions and mass. The range uses silver-plated copper-clad aluminium conductors and ePTFE / LD-PTFE insulation. These are cable construction data, not a comparison against an unspecified alternative assembly.
| Code | Centre conductor (mm) | Overall diameter (mm) | Mass (g/m) |
|---|---|---|---|
| CM-COAX-PS-LW-OD2P20 | 0.51 | 2.2 | 11.5 |
| CM-COAX-PS-LW-OD3P60 | 0.914 ± 0.008 | 3.60 ± 0.10 | ≤23 |
| CM-COAX-PS-LW-OD4P20 | 1.1 | 4.2 | 29.5 |
| CM-COAX-PS-LW-OD4P82 | 1.37 | 4.82 | 40 |
| CM-COAX-PS-LW-OD7P30 | 2.15 | 7.3 | 85 |
For a cable-only planning example, the listed mass of CM-COAX-PS-LW-OD3P60 is ≤23 g/m. Four metres therefore contributes ≤92 g using that listed bound. This arithmetic excludes connectors, protection, clamps and any other installed hardware. It is not a finished-assembly weight declaration.
Keep the RF loss budget alongside the mass budget
Compare the same required frequencies, installed length and connector arrangement for each candidate. Do not derive attenuation from outside diameter or mass. Where current data do not establish the loss of the proposed configuration, obtain the applicable evidence before closing the budget. The RF loss-budget guide provides the allocation method.
The lightweight, ultra-flexible and flexible comparison helps separate these screening priorities. A mass advantage for the cable portion does not resolve routing, connector access, reflection or phase requirements.
Review the installed route and environmental conditions
- Provide the routing drawing, support points, service allowance and connector access.
- Define static bends and any movement during installation or operation.
- State the actual temperature exposure and other applicable environmental conditions.
- Identify protection, termination, marking and traceability requirements.
- Specify the applicable project documents and the evidence needed for approval.
A material temperature capability is not a rating for every cable or connector assembly. Check each selected construction and the finished configuration against the project. See material temperature versus cable rating for that distinction.
Treat airframe assembly requirements as a project review
The ruggedized airframe assembly page is a starting point for discussing installation and protection. It does not establish a universal qualification or airworthiness approval. Identify the required standard revisions, test configuration, records and approving authority before selecting a qualification path.
FAQ: Does the “airborne” application establish qualification?
An application description identifies an intended review context. Qualification needs the evidence and approval required by the particular programme.
FAQ: Can the cable mass be used as assembly mass?
Only for the cable portion. Add the selected connectors, protection and installation items when reviewing the finished configuration.
FAQ: What should accompany a lightweight feed enquiry?
Send the route, band, loss allowance, mass allocation and programme requirements through the contact page. State any approval requirement separately from the cable shortlist.