RF Cable Loss Budget and Bend Radius: A Routing Guide
An RF cable shortlist should satisfy both an electrical budget and a physical route. A construction with suitable published dimensions may still need a different connector orientation or installed length. A low cable attenuation value also does not describe every contribution in a finished interconnect. Start with the route and the frequency-dependent system allowance.
Allocate the loss budget at each required frequency
A planning expression is cable attenuation per unit length × installed cable length, plus connector and transition allocations, plus an agreed design margin. Use consistent length units and evaluate the relevant frequency points. This is an allocation worksheet; final acceptance should use the agreed finished-assembly measurement.
| Item | Input to obtain | Review question |
|---|---|---|
| System allowance | Maximum permitted loss versus frequency | What part is available to this interconnect? |
| Cable contribution | Applicable attenuation data and cable length | Are construction, units and conditions a match? |
| Interfaces | Connector and transition allocation | Are these already included in measured data? |
| Margin | Project-agreed allowance | What variation or uncertainty does it cover? |
Do not add connector loss again when the source is already a complete-assembly measurement. Conversely, do not treat a bulk cable coefficient as an assembly guarantee. Keep typical values, maximum limits and measured sample results labelled separately. If an applicable coefficient is unavailable, leave the calculation open and request the relevant data.
Measure the route rather than the distance between ports
Include service loops, connector backshells, mounting points and any required strain relief. Record the length datum: cable cut length, connector reference-plane separation and overall assembly length are different dimensions. A drawing should identify which dimension the quoted tolerance controls.
Review bend locations before freezing the assembly length. A shorter line can require a tighter bend or make a connector carry installation loads. The custom assembly specification guide turns these route details into enquiry inputs.
Distinguish static installation from repeated movement
- State whether the bend is permanent, part of installation, or repeated during operation.
- Identify the section that moves, the bend radius and the required movement sequence.
- Check the relevant model and construction instead of applying a single diameter multiplier to every cable.
- Evaluate any required electrical change during movement separately from the initial loss measurement.
Compare candidates on the same basis
CONMOLY’s flexible, ultra-flexible and lightweight series can be screened using their published dimensions and mass. The broader RF interconnect selection guide covers loss, size, weight and flexibility together. Select the assembly only after the route and applicable electrical evidence have been reviewed.
FAQ: Can I use attenuation at one frequency for the whole band?
Use data covering the frequencies required by the project. A single published point does not establish the complete band response.
FAQ: Does a minimum bend radius establish flex life?
A bend-radius value alone does not define the number of movements or the acceptance limits during cycling. Those conditions need their own agreement and evidence.
FAQ: What if the route and loss allowance conflict?
Review length, connector orientation, candidate construction and the system allocation together. Send the route drawing and frequency-specific allowance through the contact page; keep unresolved limits explicit until a configuration is agreed.